91亚洲午夜在线_亚洲女同精品视频_精品福利一区二区_亚洲成人网久久久

What is the importance of injection molding machine adjustment of Jiangmen engineering plastics

2020-02-14 1684

Introduction skills of injection molding machine adjustment: injection molding is an engineering skill, which involves transforming plastics into useful products that can adhere to their original functions. The important technological conditions of injection molding are the temperature, pressure and corresponding effect moments that affect the plasticizing activity and cooling.

I. temperature control

1. Barrel temperature:

The temperature to be controlled in injection molding process includes barrel temperature, nozzle temperature and mold temperature.

The first two temperatures mainly affect the plasticization and activity of plastics, and the second temperature mainly affects the activity and cooling of plastics.

Each kind of plastic has different activity temperature. For the same kind of plastic, its activity temperature and differentiation temperature are different because of different origins or trademarks. This is because the average molecular weight and molecular weight distribution are different. The plastic Plasticization Process in different types of injection machines is also different, so the temperature of the selected barrel is also different.

2. Nozzle temperature:

The nozzle temperature is generally slightly lower than the maximum temperature of the material barrel, which is to avoid the "salivation" of molten material in the straight through nozzle. The temperature of the nozzle shall not be too low, otherwise early solidification of the melt will be formed and the nozzle will be blocked *, perhaps because the early solidification will be injected into the mold cavity and affect the function of the product.

3. Mold temperature:

Mold temperature has a great influence on the intrinsic function and apparent quality of products. The mold temperature depends on the crystallinity of the plastic, the product size, structure, functional requirements, and other process conditions (melt temperature, injection speed, injection pressure, molding cycle, etc.).

II. Pressure control:

In the process of injection molding, the pressure includes plasticizing pressure and injection pressure, which directly affect the plasticizing of plastics and the quality of products.

1. Plasticizing pressure:

(back pressure) when the screw type injection machine is selected, the pressure encountered by the molten material at the top of the screw when the screw rolls back is called plasticizing pressure, also known as back pressure. The size of this pressure can be adjusted by the overflow valve in the hydraulic system.

During injection, the size of the plasticizing pressure is constant with the rotation speed of the screw, so when the plasticizing pressure is added, the melt temperature will be increased, but the plasticizing speed will be reduced.

In addition, the addition of plasticizing pressure can often make the melt temperature uniform, the color mixture uniform and discharge the gas in the melt.

In general operation, the plasticizing pressure shall be determined as low as possible on the premise of ensuring excellent product quality. The detailed value varies with the type of plastic used, but it rarely exceeds 20 kg / cm2.

2. Injection pressure:

In the current production, the injection pressure of almost all injection machines is based on the pressure applied by the top of the plunger or screw to the plastic (converted from the oil circuit pressure). The effect of injection pressure in injection molding is to overcome the moving resistance of the plastic from the barrel to the cavity, give the melt filling rate and compact the melt.

III. forming cycle

The time required to complete an injection molding process is called the molding cycle, also known as the molding cycle. It actually includes the following parts:

Forming cycle

Forming cycle直接影響勞動出產率和設備利用率。

Therefore, in the production process, we should try our best to shorten all relevant moments in the forming cycle on the premise of ensuring the quality. In the whole forming cycle, the injection time and cooling time are the most important, which have a decisive impact on the quality of products. The filling time in the injection time is directly inversely proportional to the filling rate, and the filling time in the production is generally about 3-5 seconds.

The pressure maintaining time in the injection time is the pressure time on the plastic in the mold cavity, which accounts for a large proportion in the whole injection time, generally about 20-120 seconds (for extra thick parts, it can be up to 5-10 minutes). Before the molten material at the gate is sealed and frozen, the pressure maintaining time has an impact on the accuracy of the product size. If it is later, it has no impact. The pressure maintaining time also has an optimal value, which is known to depend on the material temperature, mold temperature and the size of the sprue and gate. If the dimensions and process conditions of the sprue and gate are normal, the pressure value with the smallest fluctuation scale of the product shortening rate shall prevail. The cooling time mainly depends on the thickness of the product, the thermal function and crystallization function of the plastic, and the mold temperature. At the end of the cooling time, the principle should be to ensure that the product will not change during demoulding. The cooling time is generally about 30~120 seconds. It is unnecessary to have a long cooling time, which will not only reduce the production power, but also cause demoulding difficulties for complex parts, and even generate demoulding stress when forced demoulding. Other moments in the molding cycle are related to whether the production process is connected and automated, and the degree of connection and automation.

General injection molding machines can be adjusted according to the following procedures:

According to the temperature scale provided by the material supplier, adjust the barrel temperature to the middle of the scale and adjust the mold temperature.

Measure the required injection volume, and adjust the injection molding machine to two-thirds of the estimated maximum injection volume. Adjust the reverse cable (glue extraction) stroke. Measure and adjust the secondary injection time, and adjust the secondary injection pressure to zero.

Start to adjust the primary injection pressure to half (50%) of the limit of the injection molding machine; Adjust the injection speed to the maximum. Measure and adjust the required cooling time. Adjust the back pressure to 3.5bar. Remove the degraded resin in the barrel. Select semi-automatic injection molding form; Start the injection procedure and investigate the screw action.江門工程塑料 Adjust the injection speed and pressure properly. If you want to shorten the filling time, you can add the injection pressure. As mentioned above, because there will be a process before full mold filling, the mold filling pressure can be adjusted to 100% of the primary injection pressure. After all, the pressure must be adjusted high enough so that the maximum speed that can be reached is not limited by the set pressure. If there is overflow, the speed can be reduced.

After each investigation cycle, adjust the glue injection amount and conversion point. Set the procedure so that 95-98% mold filling can be achieved according to the injection weight at the first stage of injection molding.

When the injection volume, conversion point, injection speed and pressure of the first level injection molding are all adjusted properly, the adjustment procedure of the second level pressure maintaining can be carried out.

Adjust the holding pressure properly as required, but do not overfill the mold cavity.

Adjust the screw speed to ensure that the melt is finished just before the end of the cycle, and the injection cycle is not limited.

Shorten cycle time to improve productivity

Injection cycle

For most injection molding manufacturers, the injection cycle can directly affect the following two primary purposes:

1. Get more parts from machinery every day;

2. The products meet the requirements of the guests.

Injection cycle由以下組成

Cycle start - the screw starts to move and inject;

Part gate cooling

Screw start rolling -- plasticizing stroke start

Screw return completion - screw rolling abort

If necessary, glue pumping will occur

Mold opening (perhaps including core pulling out)

The workpiece can be ejected after sufficient cooling

Ejection

Mold closure (possibly including core return)

Mold closed - cycle restarted.

The automatic injection cycle is repeated again and again in the same sequence. The cycle has three primary parts:

Mold opening time; Filling time; Mold closing time; Pressure maintaining time

The goal of productivity improvement is to complete all necessary actions in a very short time, complete ejection, and ensure that the mold is maintained (including pulling out and returning the slider and side mold core).

Therefore, any mold or injection molding machine problems that delay the opening time must be repaired. In addition, if the opening time of each injection is different, the workpiece will also be different.

Injection filling cavity (from 1-2)

For materials with good mobility, the filling time should account for 1/10 to 1/8 of the whole cycle. The key to filling is the fast and stable screw driving time and the lowest and stable injection pressure.

When the screw is pushed forward, the solution is injected into the mold cavity from the material pipe through the nozzle, the vertical channel, the cross flow, the gate, and then the resistance will be encountered. This resistance is affected by nozzle diameter, runner size, gate size, product thickness, and mold exhaust design.

The movement resistance should be improved and reduced in the mold to achieve filling balance and stability. Otherwise, because of uneven filling, the products injected into different mold cavities have different dimensions, insufficient strength, or poor appearance.

Pressure maintaining time (2-3)

When injecting crystalline materials, the pressure holding time is the most important process. This time is from the beginning of 99% melt filling in the mold cavity to the stop of gate condensation. The strength and toughness of the module are determined by whether the pressure is applied to the melt after injection molding until the component / gate solidifies. Keep a small section of the melt orientation in front of the screw when pressing. This pressure maintaining section is the key to avoid the cavity after the melt condensation is shortened, or the weak position of the gate orientation, which leads to the insufficient strength of the module.

Cooling time (4-7)

When the melt enters the mold cavity and touches the metal surface, the step of melt cooling has begun. Because the condensation temperature of semi crystalline materials is very high, the cooling time is very few. For general modules, the module should have enough cooling time after the glue is melted. If a problem is found when the module is ejected, the cooling time can be extended gradually until the problem is solved.

Mold opening time (8-11)

The mold opening time is an important part of the whole cycle, especially for the molds with inserts. Even in the more standard molds, the mold opening time is often higher than 20% of the whole cycle.

Source: Jiangmen engineering plastics http://www.f9w06.cn/


91亚洲午夜在线_亚洲女同精品视频_精品福利一区二区_亚洲成人网久久久
日本三级黄色网址| 日韩av一卡二卡三卡| 亚洲免费黄色录像| 成人黄色一区二区| 黄色片一级视频| 欧美黄色免费影院| 日本中文字幕片| 久久精品99国产| 黄色片一级视频| 国产精品无码av无码| 国产区二区三区| 午夜宅男在线视频| 日本美女视频一区| 亚洲免费在线播放视频| 国产又大又长又粗又黄| 中国女人做爰视频| 国产aaa免费视频| 男女私大尺度视频| 男人揉女人奶房视频60分| 日本wwww视频| 手机在线看福利| 黄色aaaaaa| 日韩精品手机在线观看| 成人精品视频在线播放| 免费观看日韩毛片| 超碰在线97免费| 国产成人精品免费看在线播放| 中文字幕精品在线播放| 日本中文字幕网址| 男女污污的视频| 中文字幕制服丝袜在线| av网站大全免费| 黄色av免费在线播放| 欧美成人手机在线视频| 激情六月天婷婷| 日本一极黄色片| 免费观看黄色的网站| 国产乱子伦农村叉叉叉| 亚洲欧美国产日韩综合| 影音先锋成人资源网站| 欧美亚洲另类色图| 日韩av自拍偷拍| 免费国产黄色网址| 青青草久久伊人| 婷婷五月综合缴情在线视频| 欧美一级特黄a| 天天做天天躁天天躁| 久久美女福利视频| 成人性生交视频免费观看| 131美女爱做视频| 午夜视频在线网站| 日本xxxxxxxxxx75| 色婷婷.com| 国产欧美日韩网站| 久久成年人网站| 国产91在线视频观看| 免费不卡av网站| 国产精品亚洲二区在线观看| 欧美一级黄色录像片| 欧美性猛交久久久乱大交小说| avove在线观看| 三级在线视频观看| 亚洲中文字幕无码av永久| 不卡的在线视频| www黄色av| 六月婷婷激情综合| 不用播放器的免费av| 337p粉嫩大胆噜噜噜鲁| 日本黄xxxxxxxxx100| 在线免费观看视频黄| 国产精彩视频一区二区| 91欧美一区二区三区| 日本www.色| a在线视频观看| 中国女人做爰视频| 日韩一级理论片| 六月丁香婷婷激情| 天堂а√在线中文在线| 日韩在线一区视频| 日韩在线xxx| 毛片在线播放视频| 黄色一级片av| www.51色.com| 国产精品视频分类| 欧美牲交a欧美牲交aⅴ免费真 | 国产精品97在线| 青草网在线观看| 精品少妇人妻av一区二区| 中文字幕第38页| 久久精品视频91| avav在线看| 男女激情无遮挡| 无码熟妇人妻av在线电影| 好吊色这里只有精品| 在线观看av免费观看| 久久人人爽av| 日本不卡一区二区在线观看| wwwwxxxx日韩| 又色又爽又高潮免费视频国产| 欧美亚洲另类色图| 日韩中文字幕三区| 亚洲色成人一区二区三区小说| 91精品国产91久久久久麻豆 主演| 青春草在线视频免费观看| av在线网址导航| 色天使在线观看| 欧美又黄又嫩大片a级| 黄色片免费网址| 午夜免费视频网站| 香蕉精品视频在线| 性做爰过程免费播放| 男同互操gay射视频在线看| 一区二区三区日韩视频| 成年人三级视频| 永久免费看av| 亚洲 欧美 综合 另类 中字| 99在线免费视频观看| 成人毛片一区二区| www.四虎成人| 鲁一鲁一鲁一鲁一av| 午夜视频在线网站| eeuss中文| 成人免费在线网| 国产成人a亚洲精v品无码| 国产成人精品无码播放| 奇米影音第四色| 一区二区久久精品| 91精品国产毛片武则天| 蜜臀av色欲a片无码精品一区 | 精品无码av无码免费专区| 欧美人与动牲交xxxxbbbb| 日韩xxxx视频| 88av.com| 一本二本三本亚洲码| 成年女人18级毛片毛片免费| 欧美日韩在线中文| 中文字幕国内自拍| 国产精品h视频| 精品少妇人妻av免费久久洗澡| 亚洲国产精品毛片av不卡在线| 91pony九色| 丁香花在线影院观看在线播放| av免费中文字幕| 日本黄色播放器| 黄色一级片播放| 91热视频在线观看| 国产精品久久久久久久乖乖| 动漫av免费观看| 国产成年人在线观看| 99999精品视频| 欧美精品 - 色网| www在线观看免费| 激情五月俺来也| wwwwww欧美| 国产xxxxx视频| 91精品一区二区三区四区| 黑人糟蹋人妻hd中文字幕| 天天综合天天添夜夜添狠狠添| 波多野结衣综合网| 奇米视频7777| 1024av视频| 熟女视频一区二区三区| 99热成人精品热久久66| 丰满女人性猛交| 亚洲色精品三区二区一区| 男女激烈动态图| 五月婷婷深爱五月| 可以看毛片的网址| 8x8x成人免费视频| 欧美丰满熟妇bbbbbb百度| 波多野结衣激情| 北条麻妃视频在线| 久久精品无码中文字幕| 中文字幕视频三区| 精品免费国产一区二区| 97久久国产亚洲精品超碰热| 黄色在线视频网| a√天堂在线观看| 超薄肉色丝袜足j调教99| jizz欧美性11| 欧美成人精品欧美一级乱| 成人短视频在线观看免费| 日韩欧美亚洲另类| 国产视频一区二区三区在线播放 | 五月婷婷六月合| 免费看的黄色大片| 50度灰在线观看| 久久精品久久99| 91香蕉视频导航| 国产精品wwwww| 黄色www网站| 又大又硬又爽免费视频| 激情久久综合网| www.这里只有精品| 国产成人av影视| 日韩少妇内射免费播放18禁裸乳| 乱熟女高潮一区二区在线| 在线成人免费av| 婷婷中文字幕在线观看| 亚洲欧美久久久久|